SE16
-
Change electrical systems and electrical box.
-
Remove walls around kitchen for open plan with living room.
-
Building double ceiling and install down light.
-
Install new kitchen.
-
Building new water system for additional radiator.
-
Install new shelves in storage place.
-
Bloking fire place.
-
Partition wall for additional bedroom.
-
Remove additional electic radiators.
-
Plastering and painting the house.
-
Bloking windows up the doors.
-
Building double floor in the bathroom and install new additional toilet and basing.
-
Building little double floor in the toilet and change the toilet and install snew basing.
-
Install new wardrobes,beds,cutten.....everything to the key.
-
Painting balcony and entrance area.
Before